Electrical points planner background

How many points in each room?

Start from a 2, 3 or 4 BHK and adjust room by room. See every light, fan and socket, the circuits, the load, the board size and a schedule for your electrician.

A typical 3 BHK home in Kerala needs 120 to 180 electrical points: lights, fans, 6 A and 16 A sockets, AC and geyser points, TV and data. Heavy appliances such as the fridge, mixer and washing machine need 16 A power sockets.

Rates and rules last updated 17 November 2026 · Checked by the Build 1 engineering team

1

Start from a home

Pick a size; you can change every room after.

2

Room by room

Tap a room to change its points or size.

3

Supply and lights

For the load and the board.

Your house needs about101points

14 rooms · about 18 switchboards

12-waythree-phase DB
33Lights
7Fans
5Exhaust
276A
1216A
4AC
3Geyser
2TV
2Data
5USB
1Bell
Connected load29.1 kWall points at their rating
Likely peak use11.9 kWat the busiest hour of the day
Circuits, plus spare21 + 58 light, 6 power, 7 AC and geyser
Supply to apply forThree-phaseload above 7.5 kW or 3+ ACs

Points by room

Living room15Dining7Kitchen11Work area5Master bedroom14Bedroom 19Bedroom 29Bathroom 15Bathroom 25Bathroom 35Pooja room3Sit-out5Stair and passage3Car porch and outside5
Points

Tap a room on the left to change its points. Bigger rooms need an extra light and socket.

Where the load is

16A 12 kWAC 6.8 kWGeyser 6 kW6A 2.7 kWLights 0.5 kWFans 0.5 kWTV 0.3 kWExhaust 0.2 kWUSB 0.1 kWData 0 kWBell 0 kW

AC and water heater points take most of the load, so each gets its own circuit and MCB.

How it is wired

  • Light and fan circuits: at most 10 points or 800 W each, in 1.5 sq mm copper wire.
  • Power circuits: at most 2 16 A sockets and 3,000 W each, in 2.5 to 4 sq mm wire.
  • A separate circuit for each AC and water heater, with its own MCB.
  • An RCCB (30 mA) to protect against shocks, and proper earthing with a test before handover.
  • Keep 20% spare ways in the DB for solar, an EV charger or later rooms.

Points schedule

RoomLightsFansExhaust6A16AACGeyserTVDataUSBBellTotal
Living room42·411·111·15
Dining31·21······7
Kitchen3·134······11
Work area1·112······5
Master bedroom31·411·112·14
Bedroom 121·311···1·9
Bedroom 221·311···1·9
Bathroom 12·11··1····5
Bathroom 22·11··1····5
Bathroom 32·11··1····5
Pooja room2··1·······3
Sit-out21·1······15
Stair and passage2··1·······3
Car porch and outside3··11······5
Total33752712432251101

Figures last updated 17 November 2026. Typical counts for Kerala homes. Your electrician confirms the circuits; KSEB confirms the connection.

How it is worked out

No black box. Here is the logic.

Reviewed on 17 November 2026. The numbers are in the table further down.

Points by room

  • Each room starts from typical Kerala counts for its use.
  • Small and large rooms take one light and one socket less or more.

Circuits

  • Light and fan circuits: 10 points or 800 W at most (IS 732).
  • Power circuits: two 16 A sockets at most.
  • Each AC and water heater: its own circuit.

Load and supply

  • Connected load: every point at its rating.
  • Likely peak: each kind of point times the share in use at the busiest hour.
  • Three-phase from about 7.5 kW or three ACs: confirm with KSEB.

Board size

  • Ways = circuits + 20% spare, rounded up to a standard DB.
The numbers behind this tool

Every number is on this page, and dated.

Last updated 17 November 2026. Circuit limits follow IS 732; load per point and the three-phase threshold are planning assumptions to confirm with your electrician and KSEB.

General

Click a number in the editor to change it, then press Save.

Last updated

17 November 2026

Spare ways kept in the DB

20 %

Three-phase above this connected load

7.5 kW

Circuit rules (IS 732)

Indian code of practice for wiring in buildings.

Most points on a light and fan circuit

10

Most load on a light and fan circuit

800 W

6 A socket counted on a light circuit

60 W

Most 16 A sockets on a power circuit

2

Load per point

Used for the connected load. LED lights are the default.

LED light

15 W

Older light

60 W

Ceiling fan

70 W

Exhaust fan

40 W

6 A socket

100 W

16 A socket

1,000 W

AC point

1,700 W

Water heater point

2,000 W

TV point

150 W

Data point

10 W

USB socket

20 W

Bell

5 W

Likely peak use

Share of each kind of point in use at the busiest time of day.

Lights, fans, TV, data and USB

70 %

6 A sockets

20 %

16 A sockets

20 %

AC points

80 %

Water heater points

40 %

To change a number: open the site editor, click the number, type the new value and press Save. The tool uses it straight away.

Before you build

Agree the schedule before the conduit.

Wiring is fixed once the walls are plastered. Settle these with your electrician first.

1

Walk the furniture

Place beds, sofa, TV, desk and kitchen counters on the plan, then put sockets where they will be used.

2

Switch heights

Agree switch and socket heights, two-way switches for stairs and bedrooms, and bedside switches.

3

Future loads

Leave conduit and DB space for solar, an EV charger, CCTV and an inverter. See the solar planner.

4

Test and hand over

Ask for an earth test, an insulation test and a marked DB chart at handover.

Questions

Questions about electrical points.

±A planning guide. Your engineer confirms the design on site.
Ask your own question →
How many electrical points does a house need?

A typical 3 BHK in Kerala ends up with 120 to 180 points: lights, fans, sockets, power points for the kitchen and washing machine, AC and geyser points, TV and data points. The planner starts from typical counts for each room, and you change them room by room.

What is the difference between 6 A and 16 A sockets?

A 6 A socket is for small things: phone chargers, lamps, the TV, the router. A 16 A power socket is for heavy appliances: fridge, mixer, iron, microwave, washing machine and water pump. Plugging a heavy appliance into a 6 A socket overheats it.

How many points can go on one circuit?

Under IS 732, a light and fan circuit takes at most 10 points or 800 W, whichever comes first. A power circuit takes at most two 16 A sockets and 3,000 W. Each AC and each water heater gets its own circuit and MCB.

Do I need three-phase supply?

For many larger homes, yes. With three or more ACs, or a connected load above about 7.5 kW, a three-phase connection spreads the load and avoids tripping. Confirm the limit and the paperwork with your KSEB section office.

What is a DB and how many ways do I need?

The distribution board holds the MCBs, one per circuit, plus the main switch and the RCCB. Each MCB takes a way. The planner counts your circuits, adds about 20% spare for solar, an EV charger or new rooms, and picks the board size.

Why plan points before wiring?

Points added after plastering mean chasing walls, patches and visible pipes. A room-by-room schedule, agreed before the conduit goes in, is the simplest way to avoid extension boards and surprises in the bill.

What about safety?

Use an RCCB (30 mA) to cut power in case of a shock, ISI-marked copper wire of the right size, proper earthing tested before handover, and MCBs sized to each circuit. Keep sockets in bathrooms and near water away from splash zones.

How current are the numbers?

The date at the top shows when the figures were reviewed. Room counts are typical Kerala practice, not a rule. Every number used for load and circuits is in the table on this page and can be updated.

Next step

Let’s plan your wiring.

Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.

Free site visit and plot check

Anywhere in Thrissur and Ernakulam districts.

Your price in writing in 7 days

Itemised, within 7 days of the site visit.

See a live site on a Saturday

Walk a Build 1 site with our engineer.

None added — use “Add to my brief” in Home Solutions.
We reply within one working day.
WhatsApp usCall +91 94973 07799

We reply within one working day.

Build 1 engineer on site
Talk to our team+91 94973 07799info@build1.inBuild 1, Irinjalakuda, Thrissur, Kerala
My brief (0) →