
Start from a 2, 3 or 4 BHK and adjust room by room. See every light, fan and socket, the circuits, the load, the board size and a schedule for your electrician.
A typical 3 BHK home in Kerala needs 120 to 180 electrical points: lights, fans, 6 A and 16 A sockets, AC and geyser points, TV and data. Heavy appliances such as the fridge, mixer and washing machine need 16 A power sockets.
Rates and rules last updated 17 November 2026 · Checked by the Build 1 engineering team
Pick a size; you can change every room after.
Tap a room to change its points or size.
For the load and the board.
14 rooms · about 18 switchboards
Tap a room on the left to change its points. Bigger rooms need an extra light and socket.
AC and water heater points take most of the load, so each gets its own circuit and MCB.
| Room | Lights | Fans | Exhaust | 6A | 16A | AC | Geyser | TV | Data | USB | Bell | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Living room | 4 | 2 | · | 4 | 1 | 1 | · | 1 | 1 | 1 | · | 15 |
| Dining | 3 | 1 | · | 2 | 1 | · | · | · | · | · | · | 7 |
| Kitchen | 3 | · | 1 | 3 | 4 | · | · | · | · | · | · | 11 |
| Work area | 1 | · | 1 | 1 | 2 | · | · | · | · | · | · | 5 |
| Master bedroom | 3 | 1 | · | 4 | 1 | 1 | · | 1 | 1 | 2 | · | 14 |
| Bedroom 1 | 2 | 1 | · | 3 | 1 | 1 | · | · | · | 1 | · | 9 |
| Bedroom 2 | 2 | 1 | · | 3 | 1 | 1 | · | · | · | 1 | · | 9 |
| Bathroom 1 | 2 | · | 1 | 1 | · | · | 1 | · | · | · | · | 5 |
| Bathroom 2 | 2 | · | 1 | 1 | · | · | 1 | · | · | · | · | 5 |
| Bathroom 3 | 2 | · | 1 | 1 | · | · | 1 | · | · | · | · | 5 |
| Pooja room | 2 | · | · | 1 | · | · | · | · | · | · | · | 3 |
| Sit-out | 2 | 1 | · | 1 | · | · | · | · | · | · | 1 | 5 |
| Stair and passage | 2 | · | · | 1 | · | · | · | · | · | · | · | 3 |
| Car porch and outside | 3 | · | · | 1 | 1 | · | · | · | · | · | · | 5 |
| Total | 33 | 7 | 5 | 27 | 12 | 4 | 3 | 2 | 2 | 5 | 1 | 101 |
Figures last updated 17 November 2026. Typical counts for Kerala homes. Your electrician confirms the circuits; KSEB confirms the connection.
Reviewed on 17 November 2026. The numbers are in the table further down.
Last updated 17 November 2026. Circuit limits follow IS 732; load per point and the three-phase threshold are planning assumptions to confirm with your electrician and KSEB.
Click a number in the editor to change it, then press Save.
17 November 2026
20 %
7.5 kW
Indian code of practice for wiring in buildings.
10
800 W
60 W
2
Used for the connected load. LED lights are the default.
15 W
60 W
70 W
40 W
100 W
1,000 W
1,700 W
2,000 W
150 W
10 W
20 W
5 W
Share of each kind of point in use at the busiest time of day.
70 %
20 %
20 %
80 %
40 %
To change a number: open the site editor, click the number, type the new value and press Save. The tool uses it straight away.
Wiring is fixed once the walls are plastered. Settle these with your electrician first.
Place beds, sofa, TV, desk and kitchen counters on the plan, then put sockets where they will be used.
Agree switch and socket heights, two-way switches for stairs and bedrooms, and bedside switches.
Leave conduit and DB space for solar, an EV charger, CCTV and an inverter. See the solar planner.
Ask for an earth test, an insulation test and a marked DB chart at handover.
A typical 3 BHK in Kerala ends up with 120 to 180 points: lights, fans, sockets, power points for the kitchen and washing machine, AC and geyser points, TV and data points. The planner starts from typical counts for each room, and you change them room by room.
A 6 A socket is for small things: phone chargers, lamps, the TV, the router. A 16 A power socket is for heavy appliances: fridge, mixer, iron, microwave, washing machine and water pump. Plugging a heavy appliance into a 6 A socket overheats it.
Under IS 732, a light and fan circuit takes at most 10 points or 800 W, whichever comes first. A power circuit takes at most two 16 A sockets and 3,000 W. Each AC and each water heater gets its own circuit and MCB.
For many larger homes, yes. With three or more ACs, or a connected load above about 7.5 kW, a three-phase connection spreads the load and avoids tripping. Confirm the limit and the paperwork with your KSEB section office.
The distribution board holds the MCBs, one per circuit, plus the main switch and the RCCB. Each MCB takes a way. The planner counts your circuits, adds about 20% spare for solar, an EV charger or new rooms, and picks the board size.
Points added after plastering mean chasing walls, patches and visible pipes. A room-by-room schedule, agreed before the conduit goes in, is the simplest way to avoid extension boards and surprises in the bill.
Use an RCCB (30 mA) to cut power in case of a shock, ISI-marked copper wire of the right size, proper earthing tested before handover, and MCBs sized to each circuit. Keep sockets in bathrooms and near water away from splash zones.
The date at the top shows when the figures were reviewed. Room counts are typical Kerala practice, not a rule. Every number used for load and circuits is in the table on this page and can be updated.
Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.
Anywhere in Thrissur and Ernakulam districts.
Itemised, within 7 days of the site visit.
Walk a Build 1 site with our engineer.