Start from your KSEB bill or your appliances. See the system size, panels, roof space, savings, a tentative price after subsidy, and the inverter and battery for power cuts.
In Kerala, 1 kW of rooftop solar makes about 4 units a day, around 120 a month, so a home using 300 units a month needs roughly 2.5 to 3 kW. The central PM Surya Ghar subsidy is ₹30,000 for each of the first 2 kW and ₹18,000 for the third, up to ₹78,000.
Rates and rules last updated 17 November 2026 · Checked by the Build 1 engineering team
Start from your bill, or from what you use at home.
That is about 300 units a month, a bill of about ₹4,737 every two months.
How much to cover, and what kind of system.
Needs 2.2 kW. Most homes choose 80 to 100%.
Leave blank if you are not sure.
What must keep running, and for how long.
Reviewed on 17 November 2026. The rates are in the table further down.
Last updated 17 November 2026. Tariffs, subsidy and prices change, and sources do not always agree, so treat them as a guide and check your own bill and quote.
Updated by hand when anything changes. Click any number in the editor to change it, then press Save.
17 November 2026
4 units
550 watts
100 sq ft
97 %
0.5 %
3 %
10 kW
Energy charge per unit and fixed charge a month, for a single-phase home. Slabs of 50 units each: 0-50, 51-100, 101-150, 151-200, 201-250.
3.25 ₹
4.05 ₹
5.1 ₹
6.95 ₹
8.2 ₹
40 ₹
65 ₹
85 ₹
120 ₹
130 ₹
Above 250 units one rate applies to every unit, set by the band your total falls in.
6.55 ₹
7.6 ₹
7.9 ₹
8.25 ₹
9.2 ₹
150 ₹
175 ₹
200 ₹
230 ₹
260 ₹
Added to the energy charge. The export rate is what KSEB pays for spare units left at the end of the financial year.
10 %
0.19 ₹ a unit
2.79 ₹ a unit
Central subsidy for home rooftop solar. No separate Kerala subsidy.
30,000 ₹
18,000 ₹
78,000 ₹
Tentative installed price, low and high, at five sizes. In between, the tool joins the points. Prices differ by installer and brand.
65,000 ₹
90,000 ₹
60,000 ₹
80,000 ₹
57,000 ₹
77,000 ₹
52,000 ₹
72,000 ₹
45,000 ₹
65,000 ₹
Planning ranges. Batteries are priced by the kilowatt-hour for lithium and per battery for tubular.
35,000 ₹
70,000 ₹
8,000 ₹
14,000 ₹
12,000 ₹
20,000 ₹
11,000 ₹
15,000 ₹
15,000 ₹
22,000 ₹
90 %
50 %
90 %
0.8
1.1 times
For homes that keep plain on-grid solar and add a backup inverter and battery.
6,000 ₹
10,000 ₹
9,000 ₹
14,000 ₹
12,000 ₹
18,000 ₹
20,000 ₹
30,000 ₹
40,000 ₹
70,000 ₹
60,000 ₹
100,000 ₹
80,000 ₹
130,000 ₹
Shown in the warnings and the KSEB notes. Reword it whenever the rules change.
Net metering limits and charges are set by KSERC and have changed since 2025. Single-phase connections usually allow up to 3 kW of inverter, and larger systems usually need three-phase. Confirm with your KSEB section office before you buy.
To change a number: open the site editor, click the number, type the new value and press Save. The tool uses it straight away.
The panels are the easy part. The roof, the meter and the paperwork decide how smoothly it goes.
Needs shade-free space facing south, east or west, a sound slab or sheet, and a clear route for the cable. A site visit confirms it.
If power cuts hurt, plan the battery now. It is cheaper to design in than to add later.
The subsidy needs a registered installer and an application on the national portal before work starts.
Building new? Put the panel position, cable route and meter point into the drawings. See the home systems planner.
Start from the units you use. In Kerala 1 kW of panels makes about 4 units a day, around 120 a month, so a home using 300 units a month needs roughly 2.5 to 3 kW to cover most of its bill. Covering all of it is not always best, because spare units are bought back at a much lower price than you pay.
The central PM Surya Ghar scheme pays ₹30,000 for each of the first 2 kW and ₹18,000 for the third kW, so ₹78,000 at 3 kW. The subsidy does not rise above 3 kW. Kerala has no separate state subsidy for home rooftop solar. The amount is paid to your bank account after the system is commissioned.
A plain on-grid system will not. It switches off when the grid goes down, for the safety of line workers. To keep the house running you need a battery: either a separate inverter and battery, or a hybrid system that does both jobs. The backup section sizes it from the loads you pick.
On-grid costs least and is what the subsidy was designed for. Choose hybrid if power cuts matter to you and you want solar and battery as one system. Under net metering a battery does not add to your savings, so it is a comfort purchase, not a money saver.
Lithium (LiFePO4) uses about 90% of its rating, lasts 10 years or more and needs little care, but costs more to buy. Tubular lead-acid uses only about half its rating, so you need twice the size, and it needs water top-ups and replacing every 4 to 6 years. Lithium usually costs less over its life.
KSEB slabs are charged on monthly units, even though many homes get a two-monthly bill. The tool works backwards from the bill amount using the tariff table on this page, with fixed charge, duty and surcharge. If the answer looks off against your bill, enter the units printed on it instead.
It is a tentative range from published Kerala installer prices, not a quote. The final price depends on your roof and structure, panel brand, how far the panels are from the meter and the inverter you choose. Build 1 can give you a full price after seeing the site.
The date at the top shows when they were last reviewed. KSEB tariffs, the net metering rules and equipment prices all change, and the sources we read do not always agree, so every figure is in the table on this page and can be updated.
Every good project starts with a clear conversation. Share your plot, approximate area, requirements and budget range, and we’ll suggest the right route and package.
Anywhere in Thrissur and Ernakulam districts.
Itemised, within 7 days of the site visit.
Walk a Build 1 site with our engineer.